85% of work on second check-dam at Palar river completed: WRD official
Officials say the check-dam is the second such facility across the Palar, covering Vellore, Ranipet and Tirupattur districts. The first one was built at Udayandevan village near Vaniyambadi town in Tirupattur in 2002; the facility will be ready by 2025
https://www.thehindu.com/news/national/tamil-nadu/85-of-work-on-second-check-dam-at-palar-river-completed-wrd-official/article68819136.ece
Post a Comment